Property description
Sale of new townhouses and villas in a new complex in the suburbs of Tivat.
On a private area of 23,000 m2 there will be 30 houses. All houses with panoramic sea views!
Townhouses
The area of the townhouses is 126 m2. Each apartment has: living room-kitchen, 2 bedrooms, 2 bathrooms (one with a bathtub), 2 terraces, parking space. Land plot area 200 m2. Price – from 308,000 euros
Villas
Two-story family villa area 176 m2. Living room-kitchen, 4 bedrooms, 3 bathrooms, 2 terraces, parking space. Price with a land plot of 500 m2 from 495,000 €. Price with a land plot of 1,000 m2 from 700,000 €
Three-story large villa. The area of the villa is 220 m2. The land plot area is from 1,000 to 1,200 m2. Individual layout of the ground floor, first floor, and attic like CL villas, living room-kitchen, 3 or 4 bedrooms, 3 bathrooms (one with a bathtub), 2 terraces, parking space. The price of the villa is from 750,000 €
Included in the price:
Finishing of rooms. Parquet/laminate/ceramic tiles, floors, walls, and ceilings painted in any color of choice. Complete exterior finishing. Facade, roofing, gutters
All engineering systems. Electricity according to the project, sewerage, water, boilers in bathrooms, air conditioning in the living room and bedroom, underfloor heating in bathrooms and kitchen
Bathrooms. Tiles, plumbing
Exterior landscaping. Terrace in front of the house, parking, path to the entrance of the house
Area in front of the house. Lawn, hedge
Additionally:
concreting of additional paths
swimming pool
sauna
gym
construction of house and surrounding area
installation and selection of furniture with a designer
joinery inside/outside the house
Advantages
modern reinforced concrete construction
environmentally friendly and high-quality materials
warm energy-efficient technologies
panoramic impact-resistant windows
layout of choice
*Special purchase conditions (payment method and schedule, selection of best items, etc.)
**First houses (A1, C0, C1, C2, C9, C8, C7, C18, C17) were completed in 2023. 2nd construction phase – spring 2024. 3rd final construction phase – spring 2025.